1. Grond/Weg/Waterbouw Vlaanderen
  2. Topics
  3. Strengthening waterways and coastlines
  4. All stories
Theme

Strengthening waterways and coastlines

All stories on this topic, newest first.

Back to the topic

Renovated Hydraulic Research Laboratory officially opened

The renovation of the Hydraulic Research Laboratory (WL) on Berchemlei in Borgerhout has been completed.

Hydraulic engineering

Waterbouwkundig Laboratorium trials new technology for inland waterway locks

Hydraulic engineering

Hybrid foundations at the Port of Antwerp

Foundation engineering

Second call for inland waterway transport stimulus programme: financial support for sustainable transport to Flemish seaports

General

Complex automated dewatering during preparatory works at Royerssluis

Hydraulic engineering

New quay wall and cycle route along the Roeselare-Leie Canal in Izegem

Hydraulic engineering

End-state legally enshrined in draft framework project decision

Hydraulic engineering

Cathodic protection for old quay in Port of Rotterdam is a first

Concrete

Redevelopment of the Scheldt riverbank in Wichelen enters the home straight

Hydraulic engineering

Solar Panels: An Energy Source for the Future of Civil Engineering and Infrastructure

General

Working safely in civil engineering and construction

General

Waterworks at turning basin in Grobbendonk in full swing

Hydraulic engineering

New quay wall in Blankenberge taking shape

Hydraulic engineering

Construction of the New Terneuzen Lock enters a new phase

Hydraulic engineering

Flanders is a pioneer in long-term coastal protection

Hydraulic engineering

Successful recharge well dewatering under challenging conditions

General

Efficiency, safety and data analysis key to large-scale lock and bridge renovation

Bridges & tunnels

Hydraulic engineering specialist gets stuck into new waiting basin along the Scheldt-Rhine Canal

Hydraulic engineering

Financial support for five projects bundling inland waterway transport to Flemish seaports

General

Successful formwork for Nieuwe Sluis Terneuzen thanks to unique Belgian-Dutch synergy

Hydraulic engineering

Water engineering expert also focuses on environmental and remediation projects

Hydraulic engineering

Four bridges in and around Aalst successfully prepared for remote control

Bridges & tunnels

Milestone for Nieuwe Sluis Zeebrugge: location of the lock and Nx link road confirmed

General

Foundation engineering division gives water engineering specialist even greater strength

Hydraulic engineering
Newsletter

Elke twee weken het beste van Grond/Weg/Waterbouw Vlaanderen in je inbox.

  • Projects, products, solutions and partners
  • The most interesting industry developments
  • Free and without further obligation

Sign up for free

In your inbox every fortnight.

Welcome.The next newsletter is coming your way.

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.