Tailored grading for Zuidpark
Text Niels RouvroisImage Landmeetkunde Duyck

The Gedempte Zuiderdokken together formed a long, narrow square in southern Antwerp, parallel to the Scheldt waterfront. It is a wonderful open space that was used mainly as a huge car park. That is useful, because the city needs parking. But it is also a missed opportunity. That is why this area is being transformed into a park with 2 underground car parks: Zuidpark. Work is progressing steadily and is being carried out in three phases. For the complex grading work in phases 2 and 3, main contractor Stadsbader is drawing on the expertise of TLS Duyck.
In September 2015, the decision was made that something new had to be done with the Gedempte Zuiderdokken, and conditions were laid down. Parking remains important in this area, so the parking spaces are moving underground. This frees up space above ground for a complete redevelopment. The city launched a design competition, which was won by the design submitted by the Belgian-Swiss team Tractebel, ADR Architects, Georges Descombes, in collaboration with Les Eclairistes Associés & Erik De Waele.

Limiting ground pressure
The Gedempte Zuiderdokken will become primarily a green space. More trees will be planted, along with a colourful array of shrubs, perennials and flower bulbs. The entire soil layer at the Gedempte Zuiderdokken is being replaced. The existing soil, to a depth of 1.5 metres, is being replaced with a new build-up tailored to the park’s specific planting and use. TLS Duyck (Total Levelling Solutions) was brought in to carry out the grading work in phases 2 and 3 of the project. “The new soil build-up called for a specific grading approach,” explains Pieter Duyck of TLS Duyck. “Because there is an underground capillary system for water infiltration, it was out of the question to carry out the grading work with heavy machinery. The risk of damaging the irrigation system was too great, and ground pressure had to be kept to a minimum.”
Clay granules were spread over the pipe system and graded by TLS Duyck. “We did this with our Bobcat T870, fitted with Mekos 3D control,” says Pieter Duyck. “This compact 7 to 8-tonne machine has a low impact on the ground, making it ideal for this project. A conventional bulldozer or tracked excavator would have been too heavy. The clay granules were even dropped in the central square using long-reach excavators. We initially used our Bobcat T870 to grade the clay granules to the correct level. We then graded the topsoil, before the finishing work on the park was carried out.”

Bobcat T66
The final design for the new park clearly focuses on water management: water can easily infiltrate the ground, a crate system irrigates the trees, there are rainwater tanks, the gardens and grass area act as water buffers, and water is reused for play and to store water in the swales. Pieter Duyck explains: “Water infiltration was also important in the next phase of our work, laying the paths with a semi-permeable surface. It was crucial to lay the foundation as flat as possible, because water crates were installed on it to store water for the trees. Here, too, ground pressure had to be kept to a minimum to protect the crate system while grading the gravel. Alongside the Bobcat T870, the Bobcat T66 was also used in this phase to access narrower passageways, with a minimum width of 1m75 between the trees. The T66 was also fitted with Mekos 3D control.”

Tailored solution
This project stands out not for the large volume of earthworks, but for its complexity and the specific solution required. “These are exactly the kinds of projects we target with our Total Levelling Solutions division. We offer a tailored solution for every project. We have grading equipment ranging from 4 to 22 tonnes, which we can deploy depending on the type of work. That is quite unique. TLS Duyck offers a complete solution, combining the right equipment with total-station control. GPS was not an option at the Zuiderdokken, given the trees on site and the surrounding warehouses. A total station and a complete 3D model of the park proved to be the only suitable approach,” concludes Pieter Duyck. ■
Question about this story? Ask your question
Who worked on it
Zuidpark in Antwerpen, transformatie
- main contractorStadsbader
- nivelleringswerkenTLS Duyck
- designTractebel
- designADR Architects
- designGeorges Descombes
- designLes Eclairistes Associés
- designErik De Waele
Keep following this
Get an email when a new story is published. No account needed.
- ProjectZuidpark
- SubjectPublic space
- CompanyStadsbader
- CompanyTLS Duyck
- CompanyTractebel
- CompanyADR Architects
- CompanyGeorges Descombes