Bridges & tunnels

New E42/A15 bridge over the Centre Canal: an outstanding technical and human achievement

Text Philippe Selke & Joris Hendrickx Beeld Galère & Almex metaal

Voor het eerst in Wallonië krijgt een snelwegbrug een boven- en een onderdek.
Voor het eerst in Wallonië krijgt een snelwegbrug een boven- en een onderdek.

The reconstruction of this motorway bridge in La Louvière, approximately 18 m wide and 215 m long, was carried out without interrupting traffic. This was made possible by bringing together the expertise of specialist companies such as Galère (main contractor), Almex metaal (steelwork), Dufour (lifting and materials handling) and Greisch (engineering consultancy) at an early stage. These companies are now taking on the technical and human challenge of restoring mobility within the specified reconstruction timeframe for the 30,000 road users who travel this route every day.

Emilie Fautrez, Project Director at Galère (which recently opened a new head office at its historic site in Chaudfontaine, ed.), outlines the project: “While the original plan called for the complete demolition of the bridge towards Charleroi and its replacement with a new structure, we proposed retaining the piers and abutments and replacing only the steel structure and deck. As the bridge had become unstable following an unforeseen collapse at the start of demolition (March 2025), a detailed investigation ultimately led to the decision to renew the piers and foundation slabs after all. The abutments and foundation piles will be retained. Once all the work is complete, the bridge is expected to reopen to traffic in November.”

To enable demolition, asbestos first had to be removed from the existing bridge. This took approximately a year and was carried out without affecting traffic. Since then, the work has progressed at a rapid pace: reconstruction of the piers, assembly of the steelwork, installation of the precast slabs that serve as permanent formwork, and finally, casting of the bridge deck.

Thanks to the teams’ strong commitment, the project is currently on schedule.
Moving the enormous components presented a particular challenge.

An exceptionally large steel structure

Jasper Nelen, Tender Manager at Almex metaal: “The La Louvière motorway bridge is the heaviest bridge Almex metaal has ever built. We manufactured the two steel box girders, each 220 metres long, that support the entire bridge. Due to their enormous length, we divided each one into 10 sections.

At 25 m long, approximately 6 m wide and weighing up to 77 tonnes, these sections were too large for us to lift and move with our equipment. We therefore built a lifting gantry specifically for this project to raise the 20 sections, load them onto a trailer and transport them out of the factory. Our production workshop in Hoogstraten is 120 metres long, which is not long enough to lay all the components out in a row. However, we wanted to ensure a perfect fit. So we assembled the sections one after another like a ‘train’.”

Ruben Koyen, COO of Almex metaal, adds: “We really pushed the limits of our Hoogstraten facility, in terms of production as well as handling, protective treatment and storage. The schedule was very tight: a bridge section had to be completed and moved to the blasting hall every week. The section already there then had to be moved to the painting hall, and the following week it was placed outside ready for transport. This approach kept our various halls in constant use.”

The sections were assembled one after another like a ‘train’.
The 20 sections were joined to form 6 very large units.

The key moment: installation

The next challenge was to transport the 20 enormous sections from Hoogstraten to the former Duferco site on the waterfront in La Louvière. This was done at night using abnormal-load transport. The 20 sections were then joined to form 6 very large units, which were transported by water to the construction site, a few kilometres away.

Ruben Koyen continues: “On site, we worked closely with Galère and Groupe Dufour, a company specialising in heavy lifting. They brought each of the 6 units to within half a metre of its final position, after which we made the final adjustments using pre-set markers. This enabled us to position each unit to within a few millimetres of its intended location. First, we installed the 4 spans between the abutments and piers, followed by the 2 large central spans over the canal. Thanks to close coordination with Galère and Groupe Dufour, everything fitted perfectly.”

Emilie Fautrez stresses: “Given the size and weight of the components, Galère’s teams were directly involved in lifting and securing them, which is unusual and boosted team morale. Installing the components required very precise coordination between the three companies, with communication with the crane operator handled by a single person.”

Given the size and weight of the components, Galère’s teams were directly involved in lifting and securing them.
The La Louvière motorway bridge is the heaviest bridge Almex metaal has ever built.

A double composite deck, a first in Wallonia

For the first time in Wallonia, a motorway bridge will have both an upper and a lower deck. For the lower deck, the precast slabs must be slid between the two steel box girders, a delicate operation requiring very precise guidance and the installation of temporary platforms.

Emilie Fautrez: “By the end of May, installation of the 262 precast slabs for the upper bridge deck, in 40 different types to accommodate the structural constraints and the bridge’s gradient, had been completed, making way for the reinforcement and concrete pour. The concrete was placed in successive stages at 5-day intervals to allow for movement in the bridge. The total duration of the concrete pour is estimated at just over a month.”

The former Duferco site on the waterfront in La Louvière was the final stop before the sections were transported to the construction site.
The 6 assembled units were transported by water to the construction site, a few kilometres away.
Both parties always had the same goal in mind.

Significant technical and organisational challenges

The client, SOFICO, and the implementing authority, SPW Mobilité et Infrastructures, chose to keep traffic flowing, including at night, in order to minimise disruption for road users. Traffic in both directions is routed over the adjacent bridge towards Bergen. Despite the many constraints, the project is currently on schedule. This is thanks to the teams’ strong commitment and long working days, including Saturdays.

Galère and Almex metaal are unanimous in their praise of the quality of their collaboration. “The same team followed every step closely from start to finish. Practical and budgetary challenges were resolved through consultation, which is certainly not always easy on a project of this scale. Both parties always had the same goal in mind and each took responsibility for ensuring that we could achieve it together,” they explain.

Installing the components required very precise coordination between the three companies.
By the end of May, installation of the 262 precast slabs for the upper bridge deck had been completed, making way for the reinforcement and concrete pour.

Question about this story? Ask your question

Who worked on it

E42/A15 over Centrumkanaal in La Louvière

  1. main contractorGalère
  2. steel structureAlmex metaal
  3. hijsen en goederenbehandelingDufour
  4. engineering consultancyGreisch
  5. clientSOFICO
  6. site managerSPW Mobilité et Infrastructures

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectE42/A15 over Centrumkanaal
  • ThemeFuture-proofing roads and railways
  • SubjectBridges & tunnels
  • CompanyGalère
  • CompanyAlmex metaal
  • CompanyDufour
  • CompanyGreisch
  • CompanySOFICO
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.