Schuman Square in Brussels has recently been given a completely new look. But beneath the square lay a technical challenge: how do you make an existing service duct easily accessible when installation depth is limited and access covers must withstand heavy loads? Colas and ACO found the solution in Servokat covers, made-to-measure covers that are a perfect fit for this specific situation.

From traffic space to meeting place

As main contractor, Colas was responsible for the complete reconstruction of Schuman Square. The former roundabout has been replaced by a pedestrian area and public space beside the European institutions. Beneath the revamped square is a concrete duct, approximately 2.5 metres wide and 2 metres deep, carrying various utility lines.

“The duct was not originally designed to be easily accessible,” explains Glenn Verhasselt of Colas. “It had heavy inspection covers that could only be opened using lifting equipment. During the works, we had to expose the tunnel roof and install new waterproofing. That prompted the idea of also improving access significantly.”

The new covers had to be easy to open while also withstanding heavy loads. “Although the square is used mainly by pedestrians and cyclists, it must also be able to carry heavier traffic from time to time. That is why load class D400 was required.”

Limited height calls for an adapted solution

ACO was already involved in the drainage works. This collaboration soon led to a suitable solution for the access covers: Servokat. “These covers, made from hot-dip galvanised or stainless steel, are designed for public and industrial applications. A continuous seal makes them odour-tight and watertight,” says Jürgen Kayser of ACO. “Some versions can be filled with concrete or paving blocks. There are also versions with an 8 mm-thick anti-slip chequer plate. At Schuman Square, we opted for the chequer plate version because of the limited available height.”

Servokat covers were selected, with the design adapted to the conditions at each individual opening. Gas springs were chosen for most locations. Where the available installation depth was barely 20 cm, there was not enough room even for these. The Servokat Smart was used there instead. It has mechanical springs and requires considerably less installation depth, with a frame height of just 8 cm.

Beneath the revamped square is a concrete duct, approximately 2.5 metres wide and 2 metres deep, carrying various utility lines.
The largest unit was fitted with a cast-in-situ concrete frame around its perimeter. This ensures a structural connection to the duct below.

Made to measure for large openings

The dimensions also differed from standard solutions. ACO supplies standard covers up to 1 m by 2 m. The openings at Schuman Square were larger, measuring up to 2 m by 2.5 m, so a made-to-measure solution was necessary. “Jürgen came to site in person to measure everything together,” says Verhasselt. “ACO then developed the drawings further. These were checked again and amended where necessary. Only then did the bespoke units go into production.”

For ACO, this close cooperation was essential. “Everything has to be right when you are making something to measure,” says Kayser. “That is why we take measurements on site and coordinate internally with our production department. Colas then checked the final design. This collaboration minimised the risk of surprises during installation.”

Smooth installation and access

According to Verhasselt, installation also went smoothly. Despite their size, the covers were easy to handle. The largest unit was fitted with a cast-in-situ concrete frame around its perimeter. This ensures a structural connection to the duct below.

“The collaboration was very pragmatic,” concludes Verhasselt. “Everything went smoothly, from measuring and drawing through to delivery and installation. I would definitely choose this solution again for a similar application.”

A complex challenge beneath a busy square, solved by working together to identify what was really needed. This is precisely where made-to-measure solutions prove their worth.

Een zakelijke vraag aan ACO? Get in touch

Wie aan Schumanplein werkte

  1. federale bouwheerBelirisMentioned in Eerste spadesteek voor het Schumanplein
  2. architectCOBEMentioned in Transformation of Schumanplein gets under way
  3. architectBRUTMentioned in Transformation of Schumanplein gets under way
  4. contractorColas NoordMentioned in Transformation of Schumanplein gets under way
  5. Servokat-dekselsACOIn this story
  6. main contractorColasIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSchumanplein
  • SubjectSewerage & underground infrastructure
  • CompanyACO
  • CompanyColas
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.