In Koolkerke, near Bruges, Aquafin and engineering consultancy Sweco delivered a noteworthy project to optimise the collectors serving the upgraded pumping station in Polderstraat, Koolkerke. The works were recently completed by contractor Vanlerberghe of Diksmuide, in collaboration with concrete manufacturer nv Lithobeton of Snaaskerke.
The existing collector sewer system downstream of the pumping station in Polderstraat was gradually upgraded. The station pumps the wastewater of 80,000 residents to the Bruges wastewater treatment plant (RWZI) every day. As the station’s capacity needed to be increased, the collectors had to be adapted accordingly. A new collector sewer, consisting of pipes, was laid alongside the existing collector as a bypass, with a total length of just under 2 km. The works were awarded to contractor Vanlerberghe, who soon faced a number of challenges. The high and fluctuating groundwater level, combined with the unstable subsoil, crossings with existing Fluxys pipelines, connections to the existing pipelines and, above all, the logistical challenge all had to be studied and resolved.

Prefabricated concrete elements
The contractor opted to use prefabricated concrete elements wherever possible to optimise progress. It found the ideal partner in nv Lithobeton for the supply of pipes, standard manholes, bespoke manholes and pile caps. The decision to use manhole risers wherever possible also fitted this approach and was welcomed by Aquafin. Deep well dewatering was chosen to ensure an unobstructed working area around the trench, resulting in significant time savings.
Higher productivity
The new collector was designed using reinforced concrete pipes from Lithobeton (diameter 1400 mm, length 2850 mm, weight 5,700 kg). The greater length of the pipes enabled higher productivity on site. The pipes were installed on a timber pile foundation with concrete pile caps. The trenches were reinforced using adapted trench support systems. Given the nature of the terrain, delivery of the pipes, manholes and pile caps was concentrated into a limited number of days, presenting a major logistical challenge. Thanks to this approach and careful preparation, the works were completed well within the specified timeframe, to the satisfaction of Aquafin, Sweco and the local authorities.
Een zakelijke vraag aan Lithobeton NV? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenewing pipelines and sewers
- SubjectSewerage & underground infrastructure
- CompanyLithobeton NV