Pidpa is working hard to future-proof its water production centres (WPCs) sustainably. Following the commissioning of the new centre in Essen, work is now well under way to modernise the water production centre in Oud-Turnhout. Herentals and Westerlo are also on the agenda in the near future. Pidpa wants to incorporate new sustainable insights and technologies into water production. “For example, the use of chemicals is being significantly reduced through biological iron removal,” says Koen Huysman, Manager of Sources, Installations and Buildings at Pidpa.
Every year, Pidpa, the integrated water company, produces and supplies more than 64 million m³ of drinking water to its 1.3 million customers. To do so, Pidpa operates 11 water production centres across its service area. Optimising production and supply processes is an ongoing task, with the focus consistently on sustainable and integrated water management. The construction of a new water production centre in Oud-Turnhout is part of a wider master plan to prepare the centres for a sustainable future. Pidpa is also active in the collection and transport of rainwater and wastewater, and as such manages sewerage networks in 46 municipalities. Drawing on its expertise and experience, the water company also develops innovative, tailored solutions for its customers, including water recycling and reuse.

Biological iron removal
The latest groundwater treatment technologies will be housed in a single compact, modern building in Oud-Turnhout, replacing the existing installations, which are spread across several buildings. Koen Huysman explains: “The settling tanks will be removed, and water will instead be treated using biological iron removal. This applies to all new WPCs where groundwater has a high iron content. Oud-Turnhout is unusual in that some of its sources contain arsenic, which requires particular attention. Biological iron removal also improves arsenic removal, bringing levels down to around 1 microgram per litre. To put that into context, the limit was lowered from 50 to 10 around the turn of the century. Naturally, the aim is to reduce levels as far as possible using the available technologies, while remaining within economic limits.”

Innovative applications
In 2023, Pidpa opened its new water production centre in Essen, featuring a range of innovative sustainability measures, including no chemicals in the treatment process and UV disinfection instead of chlorine. The centre is also energy-efficient and extensively automated to maximise operational reliability. These benefits are also incorporated into the new water production centre in Oud-Turnhout.
Koen Huysman explains: “Our in-house engineering department oversees the entire process, from pilot trials and design to project supervision and final commissioning. The new centre will also no longer use lime dosing, reducing sludge production by around a third. Like the centre in Essen, Oud-Turnhout will operate entirely chlorine-free. For now, Pidpa is the only water company in Flanders to have achieved this. And it will all be housed in a single compact building, which is a major benefit for maintenance too. Overall, the new centre will have ten filters and aeration in the same space, compared with the old centre’s sixteen filters, two settling tanks, separate aerators, a filter gallery, a separate high-pressure building and a sludge treatment building. Our treated-water reservoirs will also be grouped compactly beneath the building and made more accessible, further improving bacteriological reliability. Reliability will improve across the board thanks to flexible, robust and future-proof installations, equipped to meet the challenges of climate change.”

Operational in 2025
The new building in Oud-Turnhout is being constructed alongside the existing installation. This will allow the current water production centre to remain operational until the new treatment plant is commissioned. Preparatory work began in late 2021, followed by construction of the new water production centre in 2022. The centre is scheduled to enter service in spring 2025.
“The changeover will be phased. Initially, the old and new centres will operate together,” says Geert Callaert, civil design engineer at Pidpa. “Production at the new centre will then be gradually ramped up, while the old centre is taken out of service in stages. Commissioning will take several months. The water production centre is not the only facility being completely renewed: nearby pipelines are also being relaid, and our staff will have a new service building. This comprehensive renewal will equip our installations, pipelines and buildings for several more decades.”

Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWaterproductiecentrum Pidpa Oud-Turnhout
- SubjectSewerage & underground infrastructure