New local authorities must put sewerage on the agenda!

To meet European targets, the wastewater of an additional half a million Flemings must be treated by 2027.
Under the European Water Framework Directive, our waterways and rivers must be clean or in “good ecological status” by 2027 at the latest. Today, not a single Flemish river meets that standard.
What is more, 87% of our waterways are rated as poor or inadequate. One of the causes is ongoing pollution from households. 84% of Flemish residents are connected to a wastewater treatment plant. The wastewater of 1 in 8 Flemings is therefore still discharged untreated. This is unacceptable and must be remedied quickly.
The 1st challenge: connect an additional half a million Flemings to wastewater treatment by 2027 at the latest
The Flemish Environment Agency has calculated that the wastewater of an additional half a million Flemings must be treated between now and 2027. This will enable households to do their part in meeting European clean water targets. Industry and agriculture must also make a significant contribution.
Flanders has worked hard in recent years, and the results are there for all to see. The finish line is in sight, and the final major step towards clean waterways is achievable, provided we act and work faster.
The average lead time for a sewerage project, from initial design through to completion of the works, is more than 6 years. That is far too long, and as a result the level of wastewater treatment in Flanders is increasing too slowly. In the past six years, progress amounted to just five per cent, compared with 16% between 2006 and 2012. We need to work faster again! And that applies to everyone. All stakeholders in wastewater treatment must take responsibility.
The financial impact: €4 billion.
Connecting another half a million Flemings to wastewater treatment infrastructure will cost around €4 billion. €1.3 billion has already been allocated to projects that have been approved. This means a further €2.7 billion needs to be invested in new projects.
Vlario is seeking a number of guarantees in this regard.
First and foremost, local authorities must now take action, as municipalities, intermunicipal organisations and infrastructure managers are responsible for investing in new infrastructure. It is essential that the remaining effort is reflected in multi-year plans, and that revenue from water bills is actually invested exclusively in this work.
The Flemish Government also still has work to do: political decisions are needed on burden-sharing, linking Flemish subsidies to targets, and price regulation. VLARIO is calling for clarity on these issues in the next coalition agreement.
VLARIO is also calling for the introduction of an infiltration bonus. Rainwater drainage accounts for 50 to 60% of sewerage costs. Rainwater should be retained on site, reused and/or allowed to infiltrate as much as possible to prevent flooding. Just 10% of the water used by Flemings is rainwater. This needs to improve!
A transparent water bill that lists the costs of rainwater drainage and treatment separately gives residents and business owners the opportunity to benefit from the infiltration bonus and make meaningful use of rainwater. For sewer managers, less rainwater means lower costs.
The 2nd challenge: more frequent and severe flooding
No one will escape the effects of climate change in the years ahead. We will face more extreme weather: more heat and drought, but also more rain and storms, in forms and at intensities we have not experienced before! Today, we already consider downpours delivering 40 to 60 mm of rain in an hour to be severe. But experts say we must prepare for downpours of 90 mm or more per hour in the future. This means severe flooding, and calls for far-reaching local measures to protect ourselves. This is precisely where municipalities have an important role to play, in cooperation with residents, businesses, polders, water boards and sewer managers.
VLARIO has long called for every municipality to draw up and implement a rainwater management plan. Such plans must address not only public spaces, but also future land subdivisions and other development projects, as municipalities usually take over the management of these projects once they have been transferred.
The 3rd challenge: sewer maintenance
We also need to maintain the sewers already in place. Our existing sewer network is old. Most municipal networks date from the 1940s to the 1960s. In cities, they are on average another century older. They date back to the mid-nineteenth century, when Belgium had only just become independent. We are still a long way from shedding this historic legacy, and the consequences are significant. Sewers burst, tree roots grow into them, and seals fail. This causes sinkholes and also has a harmful environmental impact: wastewater seeps into the soil and causes pollution. All municipalities and sewer managers need to develop a robust asset management plan.
Together for clean water: this is what VLARIO is campaigning for!
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeRenewing pipelines and sewers
- SubjectSewerage & underground infrastructure