Sewerage & underground infrastructure
KWS separators tailored to ambitious Alibaba project

As part of the works for Alibaba at Bierset Airport, Nelles Frères is responsible for soil remediation, earthworks, underground drainage, some of the utility services and all the finishing works (kerbs, asphalt, concrete, paving …). The installation of three Oleopator-G-H units was also part of the contract.
These are high-capacity KWS separators manufactured by ACO.
The site covers around 55,000 m² and mainly comprises access roads for lorries and cars leading to the new logistics hall, which measures around 30,000 m². This major project had to be completed in just eleven months. Thomas Bastin, site manager at Nelles Frères: “We started in August 2020 and have to finish in June. It is a pretty tight deadline, which calls for good coordination between all the parties involved.”

Large, but easy to install
The surfacing consists mainly of asphalt (around 40,000 m²), concrete slabs for access to the loading and unloading areas (around 4,000 m²) and paving. The Oleopator-G-H units drain all the water from the asphalt-surfaced areas. They were sized by international consultancy AECOM and installed without a hitch. Thomas Bastin: “We are used to installing products of this kind, but they are rarely this large. One separator had a capacity of 200 litres per second, while the other two had a capacity of 300 litres per second. These separators were quite large, around 30 m long including the silt trap for the 300 l/s model, but very light. One unit was even installed at a depth of 8 metres, which involved substantial earthworks.”

Excellent technical support
“We benefited from excellent cooperation with Frank Lenaers, sales manager at ACO, who provided us with all the technical information in advance, together with his engineer: connection levels, gradients to be maintained, materials to be used for installation, methods for applying ballast to the separators … All of this was communicated very clearly, allowing us to plan our work effectively. Installing the separators was a real pleasure after months of technical preparation. We were finished in just two days,” says Thomas Bastin.

Separators in three zones
Eng. Rony Verbuyst, Project Engineer at ACO: “The client was looking for a system capable of draining all the surface water from three zones of 1 to 1.5 hectares, while keeping the number of separators to an absolute minimum. We addressed this specific requirement by installing one separator in each of the three zones, sized in accordance with the Belgian Building Research Institute’s rainfall intensity parameters, namely 200 litres per second per hectare. The final choice was one 200 l/s KWS separator with an integrated silt trap and two 300 l/s KWS separators with separate silt traps.” This project is a perfect fit for ACO’s expertise: when high-capacity models are needed, with a capacity of more than 100 l/s, the Oleopator-G-H is always an excellent choice.
Robust, but easy to transport
These KWS separators are made from glass fibre-reinforced polyester, which is stronger than polyethylene. For this project, they were installed at a minimum drainage depth of 5 m beneath the new surfacing, which is an advantage. To ensure trouble-free installation, ACO’s engineers worked with the contractor to determine the required load rating for the manhole covers, the correct height and the appropriate diameters for the inlet and outlet fittings. The icing on the cake was that the separate silt traps for the 300 l/s separators offered a transport advantage, as the separators and silt traps could be transported separately.
Een zakelijke vraag aan ACO? Get in touch
Wie aan Alibaba werkte
- contractorNelles FrèresIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAlibaba
- ThemeFuture-proofing roads and railways
- SubjectSewerage & underground infrastructure
- CompanyNelles Frères
- CompanyACO