Sewerage & underground infrastructure
KWS separators tailored to ambitious Alibaba project

As part of the works for Alibaba at Bierset Airport, Nelles Frères is responsible for soil remediation, earthworks, underground drainage, some of the utility services and all finishing works, including kerbs, asphalt, concrete and paving.
The installation of three Oleopator-G-H units was also part of the contract. These are high-capacity KWS separators manufactured by ACO.
Text | Niels Rouvrois and Philippe Selke Image | Nelles Frères
The site covers around 55,000 m² and mainly comprises access roads for lorries and cars to the new logistics hall, which covers approximately 30,000 m². This large-scale project had to be completed in just eleven months. Thomas Bastin, site manager at Nelles Frères: “We started in August 2020 and have to finish in June. It is a fairly tight deadline, requiring good coordination between all the parties involved.”

Bulky, yet easy to install
The surfacing consists mainly of asphalt, covering around 40,000 m², concrete slabs at the loading and unloading areas, covering around 4,000 m², and paving. The Oleopator-G-H units drain all the water from the asphalt-surfaced areas. They were sized by the international consultancy AECOM, and their installation went smoothly. Thomas Bastin: “We are used to installing this type of product, but rarely are they this large. One separator had a capacity of 200 litres per second, and two others had a capacity of 300 litres per second. These separators were quite bulky, around 30 m long, including the silt trap, for the 300 l/s model, but very light. One unit was even installed at a depth of 8 metres, which involved substantial earthworks.”
Excellent technical support
“We benefited from excellent cooperation with Frank Lenaers, sales manager at ACO, who, together with his engineer, provided us with all the technical information in advance: connection levels, gradients to be observed, the types of materials to be used for installation, methods for ballasting the separators … It was all communicated very clearly, enabling us to plan our work effectively. Installing the separators was a real pleasure after months of technical preparation. We were finished in just two days,” says Thomas Bastin.

Separators in three zones
Eng. Rony Verbuyst, Project Engineer at ACO: “The client was looking for a system capable of fully draining surface water in three zones of 1 to 1.5 hectares, while keeping the number of separators to an absolute minimum. We responded to this specific requirement by installing one separator in each of the three zones, sized according to the WTCB parameters for rainfall intensity, namely 200 litres per second per hectare. The final choice was one 200 l/s KWS separator with an integrated silt trap and two 300 l/s KWS separators with separate silt traps.” This project is a perfect fit for ACO’s expertise: when high-capacity models are required, above 100 l/s, the Oleopato
r-G-H is always a good choice.

Robust yet easy to transport
These KWS separators are made from glass-fibre-reinforced polyester, which is stronger than polyethylene. In this project, they were installed at a minimum drainage depth of 5 m below the new surfacing, an advantage. To ensure trouble-free installation, ACO’s engineers worked with the contractor to determine the required load rating for the manhole covers, the correct height and the appropriate diameters for the inlet and outlet fittings. The icing on the cake was that the separate silt traps for the 300 l/s separators made transport easier, as the separators and silt traps could be transported separately.
Een zakelijke vraag aan ACO? Get in touch
Wie aan Alibaba werkte
- engineering consultancyAECOMIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAlibaba
- SubjectSewerage & underground infrastructure
- CompanyACO
- CompanyAECOM