Sewerage & underground infrastructure
A hands-on problem-solver from start to finish in the foundation sector

Years of experience, practical thinking, close site supervision, a modern fleet of machinery and a broad range of foundation techniques.
These are all ingredients that foundation specialist Mees bvba has relied on for years. The company from Kasterlee demonstrated this, among other projects, on a mass-concrete construction project in Hasselt and during the construction of the Fietsostrade in Zaventem. “We offer our clients a complete solution, from a broad range of foundation techniques to excavation and demolition work,” says managing director Jan Mees.
Mees bvba has an experienced team specialising in foundation techniques, including the installation of Berlin walls, ground anchors, micropiles, underpinning, displacement piles, pit foundations and secant pile walls. “Our modern fleet of machinery and years of experience enable us to stabilise construction projects, temporarily or permanently,” says Jan Mees. “One of our major strengths is that, alongside foundation work, we can also take care of excavation and demolition work for our clients. That means the entire job stays in the same hands.”

A comprehensive service
This is seen as a major added value. Jan Mees explains: “A specialist foundation contractor typically has few, if any, excavators or other mobile equipment. For small excavation jobs, a subcontractor then has to be brought in. That is not the case with us, as we can carry out this work ourselves. We also have our own containers with generators and provide our own water. So clients do not need to arrange a water or electricity supply on site. This is the comprehensive service we offer, at no extra charge. This resourcefulness is in the company’s DNA, and it is certainly not standard in the foundation sector. We combine this service with a wealth of experience in all types of foundation techniques.”
Mass-concrete construction in Hasselt
Mees bvba demonstrated this in Hasselt, where it drilled a 280 linear metre secant pile wall, 10 m deep, for a mass-concrete construction project. The wall created a water-retaining enclosure to prevent damage to neighbouring buildings.
“We also installed the tension piles in the basement,” says Rob Heylen of Mees bvba. “Because we have our own engineering department, we can provide clients with both the dewatering report and the design calculations. By communicating clearly with the municipal authorities and discharging the dewatering water at a controlled rate, we can optimise the diaphragm walls. That also makes the solution more cost-effective for the client.

Fietsostrade in Zaventem
Mees also demonstrated its expertise during work on the Fietsostrade in Zaventem. Rob Heylen explains: “Here we built an anchored Berlin wall around 600 linear metres long and carried out the earthworks. Our engineering department optimised the work so that we could install the wall using a 25 t crawler crane with a rotating cab. This was essential because there was no room for a large piling rig. Due to the limited headroom under a bridge and the hard ground, we had to use our movax on a small section. It can clamp the sections both at the sides and at the top. We also used our auger to pre-drill.”

Environmental awareness
Mees bvba is willing to invest in equipment. Jan Mees says: “We are currently buying a machine that can install foundations to a depth of 25 m. We also recently invested in an electric micropile rig that can drill in a basement with just 2.5 m of headroom. It is highly innovative and also very important for the environment, something we are very conscious of. In a confined space such as a basement, all we need to do is plug in a cable and we can start drilling. This means less hassle for our clients and, just as importantly, our people no longer have to work in exhaust fumes indoors. We always try to keep our finger on the pulse and take the most modern approach possible. That is also essential if we are to remain relevant.”
This approach has paid off for Mees bvba. “We can look back on a very good 2020, and the credit also goes to our 30-strong team. We believe that logical thinking, problem-solving and very close site supervision are essential. And as managing director, I still work closely with both our clients and the people on site,” concludes Jan Mees.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUsing and protecting the subsurface
- SubjectSewerage & underground infrastructure