Impressive temporary bridge for E40 project

Retro Bridge is building a temporary bridge on the E40 motorway on behalf of Jan de Nul NV. As part of the works, a temporary road must be constructed on the E40 side verge towards Ghent, along the Lange Ommegangsstraat route.
Jan de Nul NV is constructing the approach embankments in earthworks up to the existing railway on both sides. They are around 200 m long in total. Retro Bridge, in turn, is providing a temporary bridge over the railway on the temporary bypass. “The bridge uses our standard RHB system and is no less than 40.5 m long,” the company says. “The clear width is 12.5 m, and the bridge is fitted with our standard H2W2 safety barrier with an integrated drainage system.”
On Wednesday 23 November, five 27 m RHB bridge sections were delivered, two of them with a safety barrier on one side. A further five RHB elements, each 13.5 m long, were delivered that day. On Wednesday and Thursday, Retro Bridge’s assembly team joined the bridge sections to create elements 40.5 m long. Each section weighs 62 tonnes. The bridge was scheduled to be installed over the railway during the following weekend, from 6:00 on Saturday until 20:00 on Sunday. Retro Bridge worked until 22:00 on Saturday to install the bridge. The client then used the remaining time to carry out additional work, so that the bridge could open to traffic on Monday morning.

To lift the five RHB bridge sections into place, Retro Bridge called on Saerens for the heavy lifting. Retro Bridge says: “With a reach of around 30 m, we had to position a 700-tonne telescopic crane on a specially reinforced abutment. Next to the crane’s set-up area, Jan De Nul had prepared an assembly area where the crane could pick up the sections and lift them into the span.”
As the abutments were already fully complete, lifting the five bridge sections into place was a precise operation. After all, they had to fit between the vertical walls of both abutments. Once the second section had been laid, Retro Bridge’s fitters used two mobile elevating work platforms to start installing HV M30x80 10.9 grade bolts along the longitudinal joint. There are around 500 in total, making it a considerable task. “The job was completed within the time limits set in advance, much to the client’s satisfaction,” the company says.