Hydraulic engineering

Infrastructure needs many times the available budget

Text and images Embuild

Grondwerkers in actie voor het waterbouwproject in Harelbeke.
Grondwerkers in actie voor het waterbouwproject in Harelbeke.

PPP projects offer a means of tackling the historic backlog

Embuild Vlaanderen is backing the initiative by Flemish Minister for Mobility Lydia Peeters to accelerate the renewal of ageing infrastructure through public-private partnerships (PPPs). The Flemish Government is making a substantial effort with the €1.6 billion allocated, but in the coming legislative terms many times that amount will be needed both to continue addressing the historic backlog and to meet new sustainability requirements. Moreover, investment in sustainability does not replace ‘traditional investment’ in maintenance and replacement. Two investment waves are required.

A study* by the Department of Mobility and Public Works shows that the budget for investment and maintenance needs to be substantially increased. A total annual operating budget of €660 million is needed for routine maintenance activities to address the historic backlog. On top of that, a one-off investment budget of €8.48 billion is required for structural maintenance and replacement.

Consideration must also be given to the necessary sustainability measures for transport infrastructure, such as depaving, landscaping, water-resilient interventions and safe cycling infrastructure. Embuild Vlaanderen says further study is needed to determine the scope of this investment programme.

Catching up through PPPs

Flanders has previous experience with launching PPP infrastructure projects. The construction of the A11 in Brugge and the raising of the bridges over the Albert Canal also involved public-private partnerships. Under a PPP, the contracting authority draws on the expertise and creativity of private partners to deliver the project, from design, financing and development through to maintenance and operation. “Not only are costs kept under control, but the infrastructure also remains up to date thanks to timely, careful maintenance,” says Marc Dillen of Embuild Vlaanderen.

“In a PPP, public and private parties commit to working together over the long term to deliver a project and create added value for society. PPP projects often involve lengthy contracts that seek to set out the rules of cooperation and the allocation of risks in a clear and specific way. Good agreements from the outset and a transparent framework between all partners are essential to maintain trust, reduce risks and achieve the best possible results. That is why a number of principles have been set out in a charter with the Flemish Government to promote cooperation between public contracting authorities and private contractors on PPP projects,” says Marc Dillen.     ■

*Final report, MOW-GIP and Asset Management project group, Flemish Broad Policy Review, 2021. 

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectHydraulic engineering
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.