Sewerage & underground infrastructure

Attractive landscaping for new administrative building

Attractive landscaping for new administrative building

Work is currently in full swing in Etterbeek on the long-awaited ‘re-urbanisation’ of the Jachthof site. A completely new urban district is taking shape on a 3-hectare site, with an impressive administrative building as its crowning glory. No prestige project is complete without attractive landscaping, so Dekempeneer is giving the surrounding public realm a thorough makeover. “This goes far beyond standard roadworks and conventional paving,” stresses project manager Gert Vranckaert. “Jachthof is an ambitious, comprehensive project that demonstrates a high degree of harmony between the administrative building and its surroundings.”

The Jachthof project is ushering Etterbeek into the 21st century. It comprises not only a town hall 2.0, accommodating the municipal administration, the OCMW and the police station, but also 250 brand-new homes, a nursery, a renovated chapel serving as a participation centre, new premises for the Centre d’Aide à l’Enfance and a central green space. The extensive site between Kazernelaan, De Haernestraat and Beckersstraat is now home to a brand-new urban district bringing together a range of functions and services. The administrative building is unquestionably the flagship of this ambitious redevelopment. It has a floor area of 15,000 m² and stands out with its bright white appearance and distinctive massing. The passive building has six above-ground levels, while the basement is reserved for 300 parking spaces and a ‘multi-faith’ funeral centre.

A highly specific build-up using Argex concrete was chosen
for the roof slab of the underground car park.

Paving follows the line of the façade

One of the features that makes the Jachthof project so distinctive is that the landscaping is closely aligned with the architecture of the administrative building. The main entrance is on Kazernelaan, where a large square for cyclists and pedestrians marks the entrance. “The finish combines sawn setts, concrete pavers and planting to create a distinctive pattern. This is no coincidence: the paving in front of the building follows the line of its curved façade. The drainage, comprising a single central linear channel that curves with the front façade, the different paving types and the planting beds form bands that further emphasise the architecture. The public lighting is also designed to complement the building’s façade,” says Gert Vranckaert, project manager at Dekempeneer.

11,000 m² in total

Beckersstraat, which runs alongside the right-hand side of the administrative building and provides access to the service area, is also being thoroughly upgraded. “Among other things, we are installing new pavements and speed humps, and addressing the existing change in level with a stepped retaining wall structure, including parapets,” explains Gert Vranckaert. “On the other side of the administrative building, we have laid parking spaces with permeable paving, as well as a new road between Kazernelaan and De Haernestraat. We are also responsible for the central green space, which connects the rear of the administrative building to the renovated chapel. We carried out the sewer works too, although these were limited to connecting drainage points to the existing sewer. The landscaping covers around 11,000 m² in total, including 7,000 m² of block paving, 1,100 m² of natural stone and 1,000 m² of asphalt surfacing. Several phases have already been completed.

We are currently working on the main entrance on Kazernelaan and the service area on Beckersstraat. The aim is to have 70% of the project completed before the construction holiday. The final three phases will follow after the construction holiday, with the hope of completing the project in full by November.”

The aim is to have 70% of the project completed before the construction holiday.

Specific build-up above underground car park

Even for an experienced contractor like Dekempeneer, the Jachthof project was no everyday undertaking. “The design offers plenty of variety and great attention has been paid to detail, right down to subtle stainless-steel edging that separates the different paving and planting,” says Gert Vranckaert. “The technical aspects also made some parts of the work challenging, especially above the underground car park beneath the administrative building, where we had to install 2,200 m² of paving and planting. The roof slab of the underground car park could bear only a limited load, so trucks and other heavy vehicles were prohibited until the works were fully completed. A highly specific build-up using Argex concrete was also chosen. It has a much lower density than other types of concrete (580 to 700 kg/m³ instead of 2,400 to 2,500 kg/m³), while still providing adequate compressive strength. The Argex concrete was delivered using dumpers and placed on top of a sub-base with mini excavators, which were only allowed to travel on temporary protection made from plastic ground protection mats. It was no easy task, but the result speaks for itself!”      

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectSewerage & underground infrastructure
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.