Text Niels Rouvrois Beeld Aertssen Group

De studiedienst ontfermt zich over volledige conceptstudies voor het uitvoeren van bemalingen van a tot z, het begeleiden, opvolgen en rapporteren van pomp- en zettingsproeven, het organiseren van staalnames met bijhorende monitoringtraject, het uitvoeren van haalbaarheidsanalyses, screenings en zettingsberekeningen …
De studiedienst ontfermt zich over volledige conceptstudies voor het uitvoeren van bemalingen van a tot z, het begeleiden, opvolgen en rapporteren van pomp- en zettingsproeven, het organiseren van staalnames met bijhorende monitoringtraject, het uitvoeren van haalbaarheidsanalyses, screenings en zettingsberekeningen …

Smeyers, part of Aertssen Group, has an impeccable reputation in dewatering. Not only as a contractor, but also as a study provider. This is crucial, as thorough preparation is the backbone of any project. During the study phase, Smeyers’ engineers and geologists carry out a detailed analysis of soil conditions and groundwater levels to develop a bespoke plan. “We take care of everything from start to finish, including guiding the client through the permitting process,” says Kevin Kegelaers, groundwater engineer at Smeyers.

Smeyers is recognised as a leading specialist in dewatering and recharge. The company, which has operated under the Aertssen Group banner since 2021, has mastered the techniques involved in carrying out the work, but also establishes itself as a valuable partner from the study and permitting stages onwards. Kevin Kegelaers says: “We have always carried out studies, but in the past these were largely limited to analysing settlement. Keeping the excavation dry was the main priority. That has changed. There is now much greater emphasis on flow rates, the circular use of dewatering water and the possible attraction or displacement of contaminants.”

“Our role as a study provider is becoming increasingly important”: Devlin Depret, groundwater engineer at Smeyers
“The importance of a comprehensive study cannot be overstated”: Kevin Kegelaers, groundwater engineer at Smeyers

Comprehensive concept studies

Smeyers manages the entire dewatering process from start to finish, including comprehensive concept studies. This also includes guidance, monitoring and reporting on pumping and settlement tests, organising sampling and associated monitoring, carrying out feasibility analyses, screenings and settlement calculations, and more … Using a computer simulation model, Smeyers accurately determines the impact of dewatering on buildings in the surrounding area, making it possible to assess the risk of potential damage in advance. All known soil parameters are taken into account. “Together with the client, we also investigate any issues relating to contamination. Above all, we look at how best to resolve them, for example by installing a counter or recharge dewatering system,” says Devlin Depret, groundwater engineer at Smeyers.

Permitting challenges

The study department is also on hand to advise and support clients as permitting applications become increasingly problematic, helping to ensure project continuity. Navigating the permitting process is complex but crucial. Smeyers guides clients through it, taking care to ensure accurate documentation and compliance with the relevant regulations. Together with the client, Smeyers develops solutions within the permitting process, ultimately arriving at a proposal tailored to their needs. “Our role as a study provider is becoming increasingly important,” says Devlin. “Because we also carry out the work, our studies are always grounded in what can be delivered. Producing a study is one thing, but it also has to be achievable. Our expertise in execution means we can guarantee a practical study.”

As Smeyers’ study department can draw on the company’s own dewatering team, it can also quickly arrange additional tests and observations.

Also as an independent consultant

Smeyers is increasingly recognised by medium-sized and large contractors as a one-stop shop for dewatering. Kevin Kegelaers says: “What may be less well known, but is certainly worth highlighting, is that we can also be engaged purely as a study consultant, without carrying out the work ourselves. That said, we naturally prefer to manage and deliver the full package from start to finish. This also offers significant added value for the client. The importance of a comprehensive study cannot be overstated. It is an upfront investment that can save you from potential problems, delays and unnecessary costs later on.”

As Smeyers’ study department can draw on the company’s own dewatering team, it can also quickly arrange additional tests and observations. “Communication lines are very short, and the teams carrying out the work and the study department can respond quickly to tackle any obstacles or newly emerging issues as a priority. This flexibility is a major advantage for our clients throughout a project,” concludes Devlin Depret..  

Een zakelijke vraag aan Smeyers nv? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectSewerage & underground infrastructure
  • CompanySmeyers nv
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.