Tight schedule and 850 m3 of sprayed concrete for Boudewijnsluis renovation

In opdracht van de Vlaamse overheid renoveren Renotec en Franki Construct in een tijdelijke maatschap (TM) de betonwanden van de Boudewijnsluis in de haven van Antwerpen.
In opdracht van de Vlaamse overheid renoveren Renotec en Franki Construct in een tijdelijke maatschap (TM) de betonwanden van de Boudewijnsluis in de haven van Antwerpen.

Commissioned by the Flemish Government, Renotec and Franki Construct are renovating the concrete walls of Boudewijnsluis in the Port of Antwerp as a temporary joint venture (TM).

“We have 130 working days to renovate the two walls, each 313 m long,” says Gert Hufkens, project director at Renotec. According to the schedule, the lock is due to return to service on 1 July.

Boudewijnsluis on the right bank of the River Scheldt in Antwerp has been completely out of service since 1 March, for a period of 4 months. During the closure, inland shipping is being diverted mainly to Van Cauwelaertsluis. Gert Hufkens: “The lock walls were clearly in need of renovation. It’s a major project, which we are carrying out together with Franki Construct as a temporary joint venture. We are responsible for the concrete renovation, while Franki Construct is handling the renewal of all the metalwork, including the suspension boxes, mooring recesses and joints. For the concrete renovation, we used hydrodemolition, a technique that uses an ultra-high-pressure water jet to remove a 13 cm-thick layer of concrete. We then restored the walls to their original condition using sprayed concrete.”

Protecting the reinforcement exposed by the hydrodemolition work was also a key consideration.

With the 1 July deadline approaching, the work is nearing completion. Gert Hufkens: “The hydrodemolition work is finished, Franki Construct has completed all the steelwork, and the final sections of the walls are now being covered with sprayed concrete. Given the length of the walls, approximately 3,350 m² of concrete, 13 cm thick, has been reapplied by spraying. The concrete was delivered directly from the batching plant in mixer trucks, and we added an accelerator on site so that the sprayed concrete could also be applied to a vertical surface. In total, we’re talking about approximately 850 m3 of sprayed concrete. Protecting the reinforcement exposed by the hydrodemolition work was also a key consideration. To do this, we installed cathodic protection.”

Keeping the water level in check

Concrete renovation is one of Renotec’s specialist services. It is not only buildings and industrial sites that need this kind of renovation. Structures such as tunnels, viaducts and locks are also part of the day-to-day renovation work of the company, based in Geel. “The work itself on this project is certainly routine for us,” says Gert Hufkens. “The main challenge was creating the right working conditions. We had to contend with high and low tides, so we had to keep the water in the lock at a workable level. We lowered the water using large pumps capable of handling 5,000 m3 per hour. The water could not be too high, or we would lose our work area. But it could not be too low either, as the bottom would rise because of the low pressure. We also installed pontoons fitted with scaffolding so that we could carry out the work.”

Given the length of the walls, approximately 3,350 m² of concrete, 13 cm thick, has been reapplied by spraying.

Keeping the train on track

With the lock out of service for four months, there was considerable pressure to complete the work. Gert Hufkens: “The work was divided into three phases. The first was a 150-calendar-day study phase for preparation and fabrication of the metal structures, followed by a 120-calendar-day execution phase and a third phase of 2 weeks for the as-built drawings. The execution schedule was therefore very tight, and it was crucial that Renotec and Franki Construct worked perfectly in tandem. For example, the metal structures had to be installed before we applied the sprayed concrete, so that the concrete could fully encase them. The train had to stay firmly on the rails if we were to meet the tight schedule. Based on where we are now, the lock should be able to return to service on 1 July.”

Timely concrete renovation significantly extends the service life of complex infrastructure, such as locks. The aim is to repair, strengthen and protect them for the future. “Renotec has established itself as a true specialist in this field. Our baseline is ‘Renovating for the future’ for a reason. This project once again shows that, thanks to our many years of experience and expertise, we can deliver major projects to a tight deadline,” concludes Gert Hufkens.     

Question about this story? Ask your question

Who worked on it

Boudewijnsluis in Antwerpen, renovation

  1. betonrenovatieRenotec
  2. metaalwerkFranki Construct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBoudewijnsluis
  • ThemeMaterials with a lower environmental impact
  • SubjectConcrete
  • CompanyRenotec
  • CompanyFranki Construct
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.