Leonardtunnel as a reference project for sustainable concrete renovation

Text and images Sanacon

Plaatsing van het KB-systeem door een gespecialiseerde aannemer
Plaatsing van het KB-systeem door een gespecialiseerde aannemer

Commissioned by Agentschap Wegen & Verkeer, extensive concrete repairs were recently carried out in the Leonardtunnel, on the R0 around Brussels. From the initial study through to the repairs, the project was successfully managed by engineering consultancy SANACON in collaboration with SBE, and can be considered a reference project for tackling concrete damage in a sustainable and cost-effective way.

A traffic-free tunnel during a night-time inspection in 2020 (note the exposed reinforcement at the entrance).

From damage assessment to repair strategy

SANACON has been involved since 2019 in the study and advice for the concrete renovation of the roof slab of the Leonardtunnel (360 m). Following incidents involving falling concrete fragments, EBS carried out a brief preliminary investigation, which confirmed the presence of chloride ingress combined with carbonation, indicating serious risks of corrosion in the underlying reinforcement. The need for a specialised approach was clear.

SBE and SANACON joined forces and carried out a thorough investigation: a fixed grid for sampling (carbonation, chlorides) and measuring concrete cover was established, enabling the entire tunnel structure, not just the visible areas of damage, to be assessed systematically. Based on further targeted investigations, including potential mapping, zones were defined according to the severity, extent and cause of the damage. This analysis was statistically substantiated using DIMCOST software.

Common types of damage around joints in the roof slab in early 2020

Repair scenarios

Ultimately, the preliminary investigation and associated remaining service life analyses led to a preliminary design with three concrete repair scenarios:

  1. Conventional concrete repairs throughout, combined with sacrificial anodes (passive cathodic protection)
  2. Combination: 60 % of the roof slab with impressed current cathodic protection and 40 % repaired conventionally with sacrificial anodes
  3. Full-surface impressed current cathodic protection system. This final option was chosen because it offered the greatest reduction in residual risk, as corrosion would be halted across the entire roof slab, and the lowest overall cost when calculated over a 50-year maintenance-free period, during which no further investment or repairs were expected to be necessary. This proved a bold choice, as the technique was still relatively unfamiliar to the client, Agentschap Wegen & Verkeer. However, discussions and coordination with SANACON allayed the client’s concerns.
Potential mapping, damage annotation on the roof slab and zoning of the cathodic protection system

From specification to implementation

Following the final decision to use impressed current cathodic protection, SANACON’s specialists worked with SBE to turn the preliminary design into a specification, bill of quantities and conceptual construction drawings. A technical assessment was also carried out before the contract was awarded to the contractor. The contractor then submitted all detailed designs to SANACON for approval. This enabled the work to get under way smoothly and efficiently. The parties worked constructively, with everything clearly agreed in advance, resulting in a very smooth delivery. Overall coordination was handled by SBE. The contractor, in turn, supplied the results of the inspection measurements and contributed to a comprehensive as-built dossier. Trust and expertise were central throughout.

The entire roof slab fitted with TiMMO strips, just before the sprayed mortar overlay was applied

Implementation and monitoring

The works covered only the roof slab of the level -2 tunnel structure. The entrance ramps and areas above were not included in the initial study and design brief. The cathodic protection system uses titanium (TiMMO) strips embedded in sprayed mortar. Each cathodic protection zone was formally approved for overcoating with sprayed mortar following a visual inspection of the installation of all system components (anode, cathode, measuring cells) and verification of the required checks (electrical continuity, absence of short circuits, measuring cell checks …).

The cathodic protection system has now been commissioned and calibrated. The parties involved can access the measurement data via a digital platform and monitor the system’s operation and performance in real time.

Preparatory concrete repairs before strip installation, with only loose material needing to be removed

Conclusion

For SANACON, the Leonardtunnel is a valuable reference project for large-scale concrete repairs in tunnels. Collaboration between all the parties involved (SBE, Agentschap Wegen en Verkeer, Jan De Nul), the phased technical preliminary investigation, the choice of innovative techniques and thorough preparation enabled the project to be delivered efficiently, safely and sustainably. It provides an example for future tunnel renovations in Flanders.

Een zakelijke vraag aan Sanacon bv? Get in touch

Wie aan Leonardtunnel werkte

  1. engineering consultancySBEMentioned in Cathodic protection as a lifeline for the Leonardtunnel roof slab
  2. engineering consultancySANACONIn this story
  3. clientAgentschap Wegen & VerkeerIn this story
  4. contractorJan De NulIn this story
  5. Preliminary investigationEBSIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectLeonardtunnel
  • ThemeExtending the life of bridges and tunnels
  • SubjectConcrete
  • CompanySanacon bv
  • CompanyAgentschap Wegen & Verkeer
  • CompanyJan De Nul
  • CompanyEBS
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.