Leonardtunnel as a reference project for sustainable concrete renovation
Text and images Sanacon

Commissioned by Agentschap Wegen & Verkeer, extensive concrete repairs were recently carried out in the Leonardtunnel, on the R0 around Brussels. From the initial study through to the repairs, the project was successfully managed by engineering consultancy SANACON in collaboration with SBE, and can be considered a reference project for tackling concrete damage in a sustainable and cost-effective way.

From damage assessment to repair strategy
SANACON has been involved since 2019 in the study and advice for the concrete renovation of the roof slab of the Leonardtunnel (360 m). Following incidents involving falling concrete fragments, EBS carried out a brief preliminary investigation, which confirmed the presence of chloride ingress combined with carbonation, indicating serious risks of corrosion in the underlying reinforcement. The need for a specialised approach was clear.
SBE and SANACON joined forces and carried out a thorough investigation: a fixed grid for sampling (carbonation, chlorides) and measuring concrete cover was established, enabling the entire tunnel structure, not just the visible areas of damage, to be assessed systematically. Based on further targeted investigations, including potential mapping, zones were defined according to the severity, extent and cause of the damage. This analysis was statistically substantiated using DIMCOST software.

Repair scenarios
Ultimately, the preliminary investigation and associated remaining service life analyses led to a preliminary design with three concrete repair scenarios:
- Conventional concrete repairs throughout, combined with sacrificial anodes (passive cathodic protection)
- Combination: 60 % of the roof slab with impressed current cathodic protection and 40 % repaired conventionally with sacrificial anodes
- Full-surface impressed current cathodic protection system. This final option was chosen because it offered the greatest reduction in residual risk, as corrosion would be halted across the entire roof slab, and the lowest overall cost when calculated over a 50-year maintenance-free period, during which no further investment or repairs were expected to be necessary. This proved a bold choice, as the technique was still relatively unfamiliar to the client, Agentschap Wegen & Verkeer. However, discussions and coordination with SANACON allayed the client’s concerns.

From specification to implementation
Following the final decision to use impressed current cathodic protection, SANACON’s specialists worked with SBE to turn the preliminary design into a specification, bill of quantities and conceptual construction drawings. A technical assessment was also carried out before the contract was awarded to the contractor. The contractor then submitted all detailed designs to SANACON for approval. This enabled the work to get under way smoothly and efficiently. The parties worked constructively, with everything clearly agreed in advance, resulting in a very smooth delivery. Overall coordination was handled by SBE. The contractor, in turn, supplied the results of the inspection measurements and contributed to a comprehensive as-built dossier. Trust and expertise were central throughout.

Implementation and monitoring
The works covered only the roof slab of the level -2 tunnel structure. The entrance ramps and areas above were not included in the initial study and design brief. The cathodic protection system uses titanium (TiMMO) strips embedded in sprayed mortar. Each cathodic protection zone was formally approved for overcoating with sprayed mortar following a visual inspection of the installation of all system components (anode, cathode, measuring cells) and verification of the required checks (electrical continuity, absence of short circuits, measuring cell checks …).
The cathodic protection system has now been commissioned and calibrated. The parties involved can access the measurement data via a digital platform and monitor the system’s operation and performance in real time.

Conclusion
For SANACON, the Leonardtunnel is a valuable reference project for large-scale concrete repairs in tunnels. Collaboration between all the parties involved (SBE, Agentschap Wegen en Verkeer, Jan De Nul), the phased technical preliminary investigation, the choice of innovative techniques and thorough preparation enabled the project to be delivered efficiently, safely and sustainably. It provides an example for future tunnel renovations in Flanders.
Een zakelijke vraag aan Sanacon bv? Get in touch
Wie aan Leonardtunnel werkte
- engineering consultancySBEMentioned in Cathodic protection as a lifeline for the Leonardtunnel roof slab
- clientAgentschap Wegen & VerkeerIn this story
- contractorJan De NulIn this story
- Preliminary investigationEBSIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLeonardtunnel
- ThemeExtending the life of bridges and tunnels
- SubjectConcrete
- CompanySanacon bv
- CompanyAgentschap Wegen & Verkeer
- CompanyJan De Nul
- CompanyEBS