Work is currently underway at Zaventem Airport on new concrete surfacing as part of the reconstruction of apron 9, which provides stands for cargo aircraft. No less than 80,000 m² of concrete is being completely renewed during the works, including the foundation and sub-base. The taxiways, service roads and shoulders on the site are also being given a new asphalt surface and (sub-)base. It is no small job, but one that suits a road contractor that has been a partner of Brussels Airport for forty years.

Since the 1970s, Colas, a road contractor and construction materials producer, has played an important role in the expansion of Belgium’s national airport. The growth in freight traffic, passengers, destinations and airlines means that the existing infrastructure sometimes needs major refurbishment. Didier Gillebert, director at Colas, says: “The existing concrete surfacing on apron 9 was about forty years old, which is roughly its expected service life, and showed signs of wear and unevenness. It was therefore time for a thorough renovation of the entire pavement structure. The adjoining roads were also in need of renewal.”

Colas

The crushed-stone foundation is made entirely from rubble recovered from the old concrete surfacing and foundation, with 100% of the material reused.


40 centimetres thick
Commissioned by Brussels Airport Company, Colas was tasked with completely renewing the ageing surfacing on apron 9, with a new layout for the aircraft parking area. The company also took charge of all infrastructure works around the guard post and the construction of new asphalt roads. Gillebert says: “The new concrete surfacing is unreinforced, but dowelled. The concrete layer is 40 centimetres thick, which is a lot, but is standard at an airport. Our experience on previous airport projects had shown us, however, that it is difficult to prevent the concrete edges from settling at this thickness. We therefore decided to use fixed formwork for the upstands of the concrete kerbs, rather than the side panels of the slipform paver.”

Extra-smooth finish
The new concrete surfacing is being laid in two layers in strips 10 metres wide: “The lower layer consists of concrete with limestone and recycled concrete aggregate, while the upper layer is concrete with porphyry aggregate. For the top layer, we used our brand-new machine: with this project in mind, we recently invested in a new slipform paver, which enables us to meet clients’ increasingly stringent quality requirements for smoothness and finish even better. This machine delivers an excellent end result.”

Colas

Thanks to Colas’s new Wirtgen SP94i slipform paver, the new concrete surfacing on apron 9 has an extra-smooth top layer.


Recycling rubble
To avoid sending waste to landfill unnecessarily, Colas reuses a large proportion of the old concrete in the new lower layer and in the stabilised crushed-stone foundation for all the pavements. This is nothing unusual for the company, Gillebert explains: “Across all our sites, we add an average of 20 to 25% recycled materials. Depending on the product, this can even rise to 40 to 50%. For the lower layer at the airport, we are reusing 20% of the coarse aggregate, while the new foundation consists of 100% crushed concrete rubble. All the material was crushed on site to the required size, after which we transported it to our plant in Nossegem to produce the new materials there.”

Far from an everyday project
Although Colas knows the airport inside out after forty years of experience, Gillebert says this is far from an everyday project: “We are talking about 80,000 m² of concrete and 31,000 tonnes of asphalt: those are substantial figures. Naturally, this is a project we are proud of, particularly as we have managed to meet all the demanding quality requirements. That is not equally straightforward for every road contractor.” Work on apron 9 is still well underway, with completion scheduled for September 2020.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeMaterials with a lower environmental impact
  • SubjectConcrete
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.