Bridges & tunnels

Lantis to renew cycle paths on Straatsburgbrug from the end of March

Lantis to renew cycle paths on Straatsburgbrug from the end of March

From Monday 31 March to Friday 16 May, Lantis will renew the cycle paths on Straatsburgbrug in both directions. Straatsburgbrug is an important link to the port and the north of Antwerp for both car and cycle traffic. The works are part of Lantis’s efforts to achieve the modal shift by improving the local and wider cycle network. Lantis expects severe disruption for car traffic, as only one lane will be available in each direction, and advises people to avoid the area. 

The cycle paths on Straatsburgbrug are currently in poor condition. To make the bridge a safe, fully-fledged cycle link again, only one lane in each direction will be available on Straatsburgbrug during the works. 

During the renewal works, the level difference between the footway and the cycle path will be removed, allowing cyclists and pedestrians to share a single, wider asphalt path. This will make Straatsburgbrug a smooth and safe link for cyclists and pedestrians once again.

Disruption for car and cycle traffic 

The closure runs from the junction with Merantistraat by Havenhuis to the junction with Vosseschijnstraat and Groenendaallaan. Cyclists will still be able to use the bridge during the works, but will take turns travelling in both directions along one side of the bridge. Please adjust your riding and drive at a moderate speed. 

Severe disruption is expected for car traffic, and it is best to avoid the area during the works. On Slim naar Antwerpen you can plan the best route and mode of transport for your destination before setting off.  

A better cycle network in and around Antwerp 

Through the Oosterweelverbinding, Lantis is delivering not only a fully-fledged, sunken Ring around Antwerp. The cycle network is also getting a major upgrade. A total of 35 kilometres of new cycle paths and cycle highways, along with numerous new or temporary cycle bridges, will make it possible to leave the traffic jams far behind. Lantis is also improving cycle infrastructure during the works. As well as adding temporary cycle paths, existing ones are being rebuilt to make them safer and more comfortable. This will enable you to cycle smoothly past the works.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBridges & tunnels
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.