General

Redevelopment of business zones in Izegem as a case study

Text and images Lithobeton

Geprefabriceerde betonelementen maken het mogelijk om extra functies te integreren in klassieke infrastructuur.
Geprefabriceerde betonelementen maken het mogelijk om extra functies te integreren in klassieke infrastructuur.

In Izegem, the transformation of the former Verbist slaughterhouse site has become an illustrative example of how redevelopment projects are approached today. A new SME park, named Global Biestpark, is currently taking shape, providing almost two hectares of additional business space. The aim is to put the site to economic use, while also taking account of how infrastructure can be adapted to climate change.

Underused sites are increasingly being given a new purpose. Rather than developing additional open space, existing locations are being brought back into use and adapted to current economic and spatial needs. This is also the case with this slaughterhouse site, which has a long industrial history. After operations ceased, Global Estate Group acquired the site in 2021. The existing buildings were demolished to make way for a modern SME park. Infrastructure works, including drainage and sewerage, are currently under way.

An integrated approach enables maximum infiltration

Water management is a central challenge in this project. For this reason, the decision was made to adopt an infiltration-based sewerage concept, allowing rainwater time to seep into the ground. Rainwater is infiltrated on site as far as possible, taking account of the available space and soil characteristics. This is an example of how paved surfaces can be combined with rainwater storage in line with the requirements of the new urban planning regulations.

Meeting these objectives on a compact business park requires an integrated approach. Green buffers are being used not only to provide visual screening, but also to help manage water. Among other things, precast concrete elements with infiltration properties and storage capacity are being used. They combine structural reliability with controlled water infiltration, making it possible to incorporate additional functions into conventional infrastructure.

Precast concrete elements meet evolving needs and requirements

Economic considerations also play an important role. With its new SME units, Global Biestpark is helping to meet strong demand for affordable, high-quality business space in the region. Its favourable location close to major transport routes makes it even more attractive to local businesses.

The works in Izegem show how rapidly the sector is adapting to new constraints. Water management is evolving from a purely technical discipline into a key design consideration, while materials and construction methods are also evolving to enable this transition. For manufacturers and contractors, this means revisiting conventional solutions and adding new functionality. In this context, prefabricated systems are becoming increasingly important.

Een zakelijke vraag aan Lithobeton NV? Get in touch

Who worked on it

Global Biestpark in Izegem

  1. precast concrete elementsLithobeton

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGlobal Biestpark
  • SubjectGeneral
  • CompanyLithobeton NV
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.