Road construction

Cities at the cutting edge?

Dimitri Strobbe
Dimitri Strobbe

Whether you work for a construction company or a road authority, we hear it almost every day: “There are too many roadworks!” Combine that with cluttered underground infrastructure and a government in debt looking for extra revenue, and perhaps there is an opportunity to address all three. I therefore have three specific proposals.

First: let’s introduce so-called reinstatement charges, as Amsterdam has done. In the Dutch capital, a charging system applies to all parties carrying out excavation work, such as cable and pipeline operators. In essence, a significant fee is levied when the public highway is opened up, and therefore damaged. 

Two birds with one stone: on the one hand, fewer roadworks and therefore less disruption. Utility companies will have to work together more and combine their projects to share the charges. On the other, this would provide much-needed revenue for the government and reduce the indirect costs incurred by municipal services for any subsequent repairs. Let’s face it, the quality of reinstatement often leaves much to be desired. In an ideal world, every worksite would of course be thoroughly inspected afterwards, but in practice that is often not possible. Problems therefore often only come to light much later. 

The reinstatement charge could be adjusted according to the area of the worksite, its impact on traffic, the type of road, the coordination required, the impact on accessibility, and so on. It would of course also depend on which party carries out the final reinstatement, and perhaps on what is being installed underground.   

Underground space is gradually becoming scarce, making projects increasingly complex and slow. So here is my second proposal: the presence of unused infrastructure should be discouraged financially. This would create an incentive to remove and recycle unused infrastructure during roadworks, a win-win that would shorten subsequent projects. An alternative would be to charge for all infrastructure in the ground. Note that this does not mean more cables should be hung along façades. This new trend is untidy and, in my view, must absolutely be stopped and avoided. 

That brings me, without a wire in sight, to my third proposal. Let’s limit infrastructure in the open ground. Alongside removing unused infrastructure, I urge that technical utility ducts or galleries be systematically included in redevelopment projects. New cables could then be installed much more quickly in future, without excavation. Utility companies would thereby contribute to government revenue, while the government takes responsibility for managing this infrastructure. Many utility companies are already in favour, and the market offers solutions using prefabricated components, from concrete to plastics. 

Utility ducts provide clearly demarcated zones for utility companies, while leaving plenty of space for water and greenery. This is much better than having tree roots grow through all kinds of infrastructure.  

The downside is the difficulty of relocating existing infrastructure into such ducts during redevelopment projects. This complexity can actually slow down the work, but it is a good investment in the future.  

In Brussels, we have already taken a step in the right direction: all regional technical galleries have recently been mapped in detail, using drones, and their management and access have been professionalised. More and more projects are incorporating cable trays underground. The forthcoming IMKL 3.0 format will also take such infrastructure into account.

This may all read like proposals to pass the costs on to taxpayers by an indirect route. But in fact, the financing shifts to the end user through a pricing mechanism that encourages some rationalisation, resulting in less disruption and fewer roadworks. I wonder whether these proposals will gain any traction…  

Dimitri Strobbe 
Director of Road Maintenance at Brussel Mobiliteit

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFuture-proofing roads and railways
  • SubjectRoad construction
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.