The one-stop shop for surveying services

Surveying is essential to the successful delivery of many construction projects, whether in architecture or infrastructure. Valuations, land subdivisions, certificates, BIM, 3D drafting, monitoring … today’s surveying practice handles a wide range of services and challenges. The associated surveyors and experts at MEET HET go a step further in the services they provide and are ready to take on any challenge.
MEET HET is a unique collaboration between several surveyors and experts, spread across Flanders. While a traditional surveying practice mainly offers surveying services, MEET HET goes further. The network also provides a number of unusual services. Bram Van Londersele, Founding partner at MEET HET: “We want to be a one-stop shop for every aspect of surveying. The aim is not to become one large company, but rather a strong network of smaller players, each specialising in a particular aspect of surveying. We are convinced that it is impossible for a surveyor or expert to specialise in everything, especially given the pace of technological innovation and changing, complex legislation.”
The MEET HET network combines the flexibility of a small company with the scale and benefits of a large practice. “MEET HET grew out of three small one-person businesses. There was a need to collaborate because larger projects are not always manageable on your own. This also made it possible to bring in more financial resources and expertise,” says Bram Van Londersele.

From reality to model
High-precision measurements
The network now has a vast fleet of equipment, and its geographical spread means that the surveyors can always respond quickly, on both small and large projects. Bram Van Londersele: “Our equipment includes highly accurate instruments such as a laser tracker, which can carry out 3D measurements to within 0.1 mm. We are also expanding our BIM department. However, we will not position ourselves as a modelling company, although we can do that too. Instead, we provide the geometry that can serve as the basis for the BIM model. For example, we survey an existing site using 3D laser scanners and then load it into the BIM package, modelled or otherwise, and make it available to the client.”
“Another important element is our settlement measurement and monitoring unit. It carries out repeat measurements to check whether anything has settled or shifted. This is particularly important during dewatering works or construction projects on unstable ground, where there is a risk of settlement in the surrounding area. A surveying team then carries out checks at set intervals. These are done manually. With today’s systems, they can also be automated. Unattended measuring instruments are placed on site to monitor conditions automatically and send the data to our servers. The client can access the data via an online platform and is automatically alerted by SMS or email if there is a problem.”
MEET HET CVBA
Schooldreef 16, 9050 Gentbrugge
T +32 9 391 48 93
www.meet-het.be/
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectGeneral
















