Een klein team met een graafmachine kan de goten op erg korte tijd stabiel plaatsen.
Een klein team met een graafmachine kan de goten op erg korte tijd stabiel plaatsen.

At the production site of a world-renowned industrial confectionery manufacturer in Aachen, Germany, the heavy rainfall of recent years has caused serious water ingress problems in the building structures. Renovation was needed.

The existing drainage system was undersized. The renovation project had to take several factors into account:

  • Increasingly extreme weather conditions, with periods of heavy rainfall over very short periods, which had to be safely drained away.
  • Local conditions that could not be changed: two operational areas responsible for the problem, with impermeable surfaces of 700 and 1,200 m² respectively.
  • Rapid renovation, to avoid disrupting operations at the site.

Drainage channel with high storage capacity 

The project team opted for a BIRCOmax-i channel system, class E 600KN, with cast-iron edge rails, 320 mm wide, 600 mm high and 1,500 mm long, fitted with a bolted-down cast-iron grating. In addition to excellent storage capacity, this drainage channel offers maximum stability and very good self-cleaning properties thanks to BIRCO’s design. BIRCOmax-i channels are self-supporting (NEN EN 1433 type I), so there is no need for a load-bearing foundation or concrete surround.

Ideal for renovation projects: Prefabricated channels can be installed from above with ease and at low cost.

Cost-effective installation

Once the hydraulic calculations and design had been completed, construction work could begin in spring 2021. The first step was to remove the old drainage system.

A small team of two skilled workers and an excavator operator carried out the work. The excavator could lift the new prefabricated channels directly into the narrow trench and position them on the sub-base. The team positioned the units in accordance with the detailed installation plan supplied by BIRCO. Finally, the gratings were fitted and bolted down. The 5 mm-thick edge rails, anchored in the reinforced concrete, protect the channel against wear and damage. They also provide anti-slip protection for the gratings and feature cathodic protection to ensure excellent durability.

Since BIRCOmax-i was installed, the drainage and water ingress problems have been resolved, even during heavy rainfall. Surface water is safely discharged into a main sewer. The project has therefore delivered a good return on investment.     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.