General

New concrete pump truck, new drilling line

New concrete pump truck, new drilling line

J.B. Construct is investing in new technologies. An old concrete pump truck has been replaced with a new SCHWING model. The pump is equipped with a 36-metre boom, bringing it fully up to date with the latest technology in the concrete industry. It also features the latest safety developments.

Bij een verhoogde productiecontrole is er communicatie tussen de keuringsinstelling en de bouwheer, iets wat niet gebeurt bij een gewone controle.

A new drilling line has been installed in the steel warehouse. It is CMA's first CNC-controlled BRD drilling line in Belgium! It drills quickly and easily in exactly the right position. It can also be used for tapping, engraving and milling slotted holes. The start of the material is detected automatically by a sensor. It can handle lengths of up to 12 metres and diameters of up to Ø35 mm. The automatic drilling line takes over a large part of the workload from the overbooked plasma cutter. This means we can serve our customers more quickly and accurately.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.