The benefits of a one-stop shop in the renovation of the Bombardier Bridge

The heavily used Bombardier Bridge in Bruges, which crosses the Ghent-Ostend Canal, was in need of a major renovation. BESIX was appointed by De Vlaamse Waterweg to carry out the works. BE Inject and Franki Foundations, both part of BESIX Group, were called on for their respective expertise in concrete repairs and micropile installation. “This allows us to operate as a one-stop shop, which offers real added value to the client,” says Martijn De Clercq, project engineer at Franki Foundations.
De Vlaamse Waterweg commissioned the renovation of the steel bridge deck, repairs to the concrete components, renewal of the road surfacing and bridge deck joints, and the installation of two new piers beneath the cantilevered approach ramps to dampen bridge vibrations. To ensure the works could be carried out safely and efficiently, the bridge was closed to all traffic from 20 February 2023 until, provisionally, the end of August 2023. A diversion via Bargeweg is in place for pedestrians and cyclists.

Three parts
Martijn De Clercq: “This is a very varied renovation project that can be divided into 3 parts. First, there is the steel bridge deck, which was removed and is being refurbished in a workshop. The bridge approach, comprising both the stairs and the cycle ramp, is made of concrete and has suffered carbonation damage in several places. BE Inject will repair the concrete where necessary. To dampen vibrations, an additional pier will also be installed beneath the floating section of the cycle ramp on each side, supported on piles installed by Franki Foundations.”
Micropiles were chosen because of the limited space available. “It is not a large job in terms of the number of piles, 2 x 6, but the main challenge is the restricted working space,” explains Martijn De Clercq. “The headroom beneath the existing approach ramp is just 2.5 m, and the ditch running alongside it also leaves very little room to work. The possibility of sandstone layers in the subsoil also means that sufficiently powerful drilling equipment must be used.”

Injection and hydrodemolition
BE Inject’s work is divided into several interventions. Before work began, a final general inspection and analysis of the work to be carried out was completed. The findings were established in collaboration and consultation with the various parties and an external consultancy. The work includes injecting cracks with epoxy resin. “By injecting the cracks, we restore the structural strength of the concrete supporting structure,” the company explains. “The epoxy resin acts like an adhesive, bonding the cracked sections back together.”
In addition, damaged concrete is removed using methods including hydrodemolition. Concrete affected by carbonation is removed using high-pressure water jets at a pressure of 2,450 bar. Phenolphthalein is then used to check that all the damaged concrete has been removed. If the results are satisfactory, work can proceed to the next stage. Given the limited concrete cover, additional anti-corrosion coating is also applied to the reinforcing bars. Finally, the area is finished with fibre-reinforced repair mortar. All these repairs are carried out in accordance with the BENOR procedure. BE Inject is a BENOR-certified company through BCCA for carrying out concrete repairs (type A).

One-stop shop
This project plays to Franki Foundations’ strengths, not least because of the challenges involved. “The main advantage for the client is that, as a one-stop shop, we can carry out all the works from start to finish. The fact that Franki Foundations was involved in the project from the very outset by main contractor BESIX is also a major advantage. We went to the site to assess the situation before the tendering phase. What is possible? What preparatory work is needed? That insight will certainly prove useful during execution, because we were able to take everything into account in the design. BE Inject is currently still carrying out the concrete renovation works, and Franki Foundations is expected to start installing the micropiles in the summer.”
A business question for BCCA? Get in touch
Who worked on it
Bombardierbrug in Brugge, renovatie
- main contractorBESIX
- concrete repairBE Inject
- micropalenFranki Foundations
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBombardierbrug
- ThemeExtending the life of bridges and tunnels
- SubjectFoundation engineering
- CompanyBESIX
- CompanyBE Inject
- CompanyFranki Foundations
- CompanyBCCA