Foundation engineering

Foundation specialist demonstrates expertise on railway bridge project

Voor de ervaren funderingsspecialist De Waal Solid Foundations is dit een project op maat geschreven, maar er waren zeker ook uitdagingen.
Voor de ervaren funderingsspecialist De Waal Solid Foundations is dit een project op maat geschreven, maar er waren zeker ook uitdagingen.

Commissioned by North Sea Port, main contractor Willemen Infra is building new roads in the Port of Ghent area. These will connect to James Cookstraat, which is itself being transformed into a railway bridge. Willemen Infra called on De Waal Solid Foundations, a full-service provider of shoring and foundation works, to install the displacement piles. “Finding a suitable construction method was certainly no easy task,” says Olivier Rens of De Waal Solid Foundations. 

The new roads will connect to James Cookstraat. As a crossing over the railway is required, the road will be raised and used as a bridge. The new roads are located in a GGA area (area-based approach). Archaeological investigations were previously carried out on the site in connection with the second phase of construction of the Kluizendok. Any archaeological remains beneath the fill may have been preserved, but they are at such a depth that the limited planned works cannot affect them. At the site of the current James Cookstraat, the planned works involve creating embankments by raising the ground for the railway bridge. This area has been filled with a 2.5 m layer of soil excavated from the dock. 

Willemen Infra called on De Waal Solid Foundations, a full-service provider of shoring and foundation works, to install the displacement piles.

Vibration-free displacement screw piles

De Waal Solid Foundations was brought in to install the pile foundations. The chosen solution was pre-drilled, double-displacement vibration-free screw piles, with a design load of 2,500 kN ULS, a diameter of 61 cm and a length of 16.5 m. A total of 72 double-displacement screw piles were drilled at an inclination of 25%, both forwards and backwards.   

The De Waal GVS drill was chosen because this type of drill can penetrate much deeper into hard strata. The system’s advantages include completely vibration-free drilling and a high usable load capacity with a relatively small pile diameter. It is also possible to install reinforcement along the full length of the pile. 

Challenges

For the experienced foundation specialist De Waal Solid Foundations, this was a project made to measure, but it certainly presented some challenges. Olivier Rens says: “Finding a suitable construction method was certainly no easy task, given the dense sand layers in the top 10 m that had to be drilled through with a large pile diameter. Installing piles at an angle, both forwards and backwards, is no simple feat either. Moreover, the works were carried out next to a railway, so we had to comply with all the necessary safety requirements. Groundwater pressure also caused a considerable amount of water to flow through the concrete. It was therefore necessary to use a different type of concrete and take measures to reduce the groundwater pressure.”

Pre-drilled vibration-free displacement screw piles were chosen.

Knowledge and experience

De Waal Solid Foundations’ knowledge and experience proved particularly valuable on this project. For example, the conditions called for a creative approach. “We pre-drilled through the dense sand layers at the top so that we could then install the piles using the double-displacement method. Thanks to our extensive fleet of machinery and more than 30 years’ experience in installing piles, we can offer the right solution for every site and ensure flawless execution.”     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFuture-proofing roads and railways
  • SubjectFoundation engineering
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.