Machines & equipment

Aertssen Logistics opts for zero-emission transport with the Nikola Tre

Aertssen Logistics opts for zero-emission transport with the Nikola Tre

Last week, the Nikola Tre hydrogen-powered truck was unveiled to the public in Phoenix, Arizona. Aertssen Group attended the launch event hosted by Nikola Corporation and immediately placed a pre-order for ten hydrogen trucks. What is more, the family business is now exploring how it can produce its own hydrogen using its own wind turbines and solar panels.

Sustainable growth

Sustainability is a key priority for Aertssen Group. The company’s 60-year history offers numerous examples, including its investment in Terra Nova Solar, the largest solar park in the Benelux. From 2011, the former gypsum mountain in Zelzate was remediated and given a new, green purpose, with 55,500 solar panels.

The family business integrates sustainability as a key aspect of its value chain. Its new logistics distribution centre in Verrebroek is central to this approach. “We are investing in renewable energy at our site through solar panels, and there is also room for a wind turbine. The office building at the new logistics site is also the first office building on Linkeroever to achieve the sustainable BREEAM certificate.” Says Greg Aertssen, CEO of Aertssen Group.

Aertssen Group

Investing in the Nikola Tre for 2023

At the launch event for Nikola’s hydrogen trucks in Phoenix, Arizona, Aertssen Group placed a pre-order for ten vehicles. Aertssen was one of more than 2,000 guests from 49 other countries who watched the demonstration drive of the 2-axle and 3-axle models from the front row. The European model, the Nikola Tre, was also unveiled in Phoenix. It will be available from 2023.

Own hydrogen filling station

Aertssen Group is now exploring the possibility of producing its own hydrogen from its wind turbines and solar panels, and is fully committed to these renewable energy sources. However, hydrogen supplies on the European market are still limited. In the United States, Nel, a partner company of Nikola Corporations, is building a network of 700 filling stations. Aertssen Group does not want to wait for the European market, however, and intends to produce its own green hydrogen. Initial discussions are under way about building a hydrogen filling station at the new logistics site in Verrebroek and at the solar park in Zelzate. The delivery lead time for the Nikola Tre gives Aertssen Group just enough time to secure the permits and build its own hydrogen filling station.

CO2-neutral transport

In this way, Aertssen Group aims to use green energy for transport and become a trendsetter for transport within and beyond the ports. “The Nikola Tre has a range of 800 to 1,200 km. That means greener transport for us. We will also be able to establish sustainable links between Belgium’s main ports in Antwerp, Ghent and Zeebrugge,” says Sam Aertssen, Business Unit Manager Aertssen Transport & Logistics.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectMachines & equipment
Share this article

Follow Grond/Weg/Waterbouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.